Contractors are continuing to grade the southwest slope of the site, and grading is occurring on the northeast slope.
· Regulated solid waste, which consists mostly of dimensional lumber, is being removed and staged in a separate area. Scrap tires are also being removed and staged in a separate area.
· Approximately 100 loads of soil per day are being retrieved from the borrow pit.
Borrow Pit:
· Silt fencing and an exit pad were installed at the entrance/exit of the pit to minimize sedimentation and tracking offsite.
