Site conditions:
- Less smoke was observed than the day before, and the ground was muddier due to rain
Activities:
- Rip rap and other stone were staged for use
- A “No Dumping” sign was placed at the site entrance
- Some 183 truckloads of material were hauled from the borrow pit to the site on Tuesday, and 150 and 200 loads were expected to be moved today if conditions permit