Site Conditions:

  • Smoke can be observed in a few areas on the western side of Section B
  • Odor can be detected throughout the site
  • Surface conditions are very damp due to rain

Activities:

  • Grading work continues on the western areas of Section A and B, and the northern area of Section B
  • 93 loads of off-site borrow materials were delivered
  • 220 loads of on-site borrow materials have been used thus far
  • Road to the northern part of Section B is being constructed