Site Conditions:
- Smoke can be observed in a few areas on the western side of Section B
- Odor can be detected throughout the site
- Surface conditions are very damp due to rain
Activities:
- Grading work continues on the western areas of Section A and B, and the northern area of Section B
- 93 loads of off-site borrow materials were delivered
- 220 loads of on-site borrow materials have been used thus far
- Road to the northern part of Section B is being constructed