Site Conditions:
  • No smoke observed on the site
  • Odor can be detected at the top of the hill on the southern section of the site
Activities:
  • Excavated area at the top of the hill on the southern section has been backfilled
  • Grading and BMP installation and maintenance taking place, with fill material being brought in from the borrow pit
  • 104 truckloads of material were brought in yesterday from the borrow pit, with about the same amount expected today